CENTRAL WASTEWATER PROJECT, RECONSTRUCTION PROGRAM (ER7-5) / KASSI-2015-010

The project involves construction of a sludge treatment system. Enfra is in charge of providing a detailed design of three lines and two pump station to transfer sludge. Enfra is also in charge of supervising all detailed elements. Shop drawings are also carried out by Enfra.

work-img

LOCATION : Palestine, Gaza strip

STATUS : Done Finished in:2015

BUDGET : 49000

CLIENT : Coastal Municipalities Water Utility (CMWU)

DONOR :


ENFRA RESPONSIBILITIES :

Detail design of three lines and two pump station to transfer sludge from:

  • Anaerobic bounds to sludge holding bound through gravity line.
  • Pumping sludge from holding ponds to sludge drying bonds. And Pumping sludge from sludge settling tank to anaerobic ponds.