The project aims to evaluate the foundations of Al Yaman El Saeed hospital and check if the strength of these foundations can be adequate to resist the loads. The building area is about 1000 m2.
LOCATION : Gaza
STATUS : Done Finished in:2012
BUDGET : 500,000
CLIENT : Islamic Society
DONOR :
ENFRA RESPONSIBILITIES :
-Study the building foundations.
-Define the safety level of foundations at the current stage.
-Define the safety level of foundations after adding new floor.
-Do studies to enlarge the dimensions of hospital foundations and strengthening it.
-Preparing the final report of the technical study.