Planning and design of the Palestinian Red Crescent Society's central warehouse building in the Gaza Strip. The project includes the construction of 3 stores on the ground floor, a car garage on the first floor connected to the public street and a second floor of the PRCS.
LOCATION : Gaza Strip
STATUS : Done Finished in:2017
BUDGET : 3000000
CLIENT : Palestine Red Crescent (PRC)
DONOR :
ENFRA RESPONSIBILITIES :
.Preparation of detailed design drawings
.Preparation of different bid documents including (Bill of quantities, general and special conditions and technical specifications
.Preparation of the preliminary cost estimation of the project
.Participation in the bidding and in the selection of the winning contractor