Rehabilitation and Infrastructure of Al Rasheed Regional Road– Gaza Strip

 

The aim of the project was to rehabilitate, maintain, and develop Al Rasheed Regional Road from North Gaza to Rafah Crossing point. The consultancy services involve, in the Preliminary Stage, Assessment of existing road, review of urban planning issues, preliminary design concepts including soil investigation, site surveys, design calculations and layouts. In the final stage, the consultancy services involve: detailed Design & Tender Documents and reproduction of the required number of drawings and tender documents for tendering purposes.

The consultants prepare profiles for all the roads regardless showing pipe locations with respect to the road surface, the invert level of the pipe, the diameter, the asphalt level, depth, distance, and diameter of manholes, culvert (if required) etc.  Slopes for surface storm water drainage and necessary facilities will be also specified and shown in the drawings.

work-img

LOCATION : Gaza strip

STATUS : Done Finished in:2016

BUDGET : 168000

CLIENT : Ministry of public works and housing

DONOR :


ENFRA RESPONSIBILITIES :

  1. Reviewing topographical survey
  2. Participating in the road geometric design and calculate each layer the pavement
  3. Supervising the design road pavement and asphaltic layer design.
  4. Design the structural work of storm water harvesting system.
  5. Reviewing the tender documents including:
  • General conditions documents
  • Special conditions documents
  • Awarding and Contract forms
  • The technical specification documents.
  • The BOQ


Our Clients