LOCATION : Gaza Strip
STATUS : Done Finished in:2013
BUDGET : 1000000
CLIENT : National Islamic Bank - Gaza
DONOR :
ENFRA RESPONSIBILITIES :
Preparing Topographical Survey
Study the current situation of this building according to the structural engineering
rehabilitate the damaged structural elements
Preparing a report that showing the results of the evaluation of these buildings