LOCATION : Gaza Strip
STATUS : Done Finished in:2017
BUDGET : 0
CLIENT : Agriculture Development Association (PARC)
DONOR :
ENFRA RESPONSIBILITIES :
Prepare Stormwater Calculations and Runoff quantities
Preparing Scenarios for pond design
Storm Water Volume for proposed scenarios in Um-AlNasser Lagoon
Detailed designs of the pond to collect maximum rainwater with least cost in terms of land and money. The design included the detailed of Strom water Gravity Pipe 16'' and Pressure lines 4'' the needed carrier pipelines that connect farmers with the pond. The design included all drawings, details, Bill of quantities and cost estimates in a manner sufficient for tendering
Prepare Irrigation System Management and detailed Calculations